Solar

Bison Solar

Capacity:
30 MW
Annual Yield:
61 mil. kWh
Country:
USA
State:
Colorado
Commissioning:
2016
Modules:
117120

The 30 Megawatt (MW) Bison Solar Project achieved substantial completion in October 2016. The Project is located in north Wellington, Colorado, and was constructed by JSI Construction Group, the Engineering, Procurement, and Construction (EPC) Contractor. The Bison Solar facility is built adjacent to the Platte River Power Authority – Rawhide Energy Station; a 200 plus MW coal facility. Bison Solar LLC owns the facility and will be operated by the JSI O&M Group. The Bison Solar Project includes more than 117,000 panels, and generate power for approximately 5,000 average size residential homes in Colorado.

  • Construction Began in February 2016
  • Commercial operation was achieved in October 2016
  • Includes 117,120 modules constructed on the juwi (JES) single axis tracker
  • Project Owner: Bison Solar LLC (PSEG Solar Source)
  • Annual generation (avg) 61,000 MWh

Back to list

More topics

Solar

Newest article

Renewable Mining: juwi and KPS Form Strategic Alliance for Hybrid Systems

juwi Australia and KPS, a subsidiary of Pacific Energy Limited, will jointly offer remote mining... more

Largest Off-Grid Solar Project Complete

The innovative system will save 12,000 tonnes of CO2 and 5,000,000 litres of diesel per annum. more

Largest Off-Grid Solar Project Complete

The innovative system will save 12,000 tonnes of CO2 and 5,000,000 litres of diesel per annum. more


Subscribe as RSS feed